Staffing solutions for plant managers

Oct. 4, 2011

Those maintenance professionals of a certain age are probably going to be leaving the salt mine behind when they decide it's more fun to sit under a palm tree with a margarita in their hand. But the mines, mills, and factories must keep operating or the U.S. economy will be in a deeper pit than it already is now. How industry compensates for the inevitable departure of another seasoned pro or three is critical.

Those maintenance professionals of a certain age are probably going to be leaving the salt mine behind when they decide it's more fun to sit under a palm tree with a margarita in their hand. But the mines, mills, and factories must keep operating or the U.S. economy will be in a deeper pit than it already is now. How industry compensates for the inevitable departure of another seasoned pro or three is critical.

You could count on greater productivity from those maintenance folks who remain. It’s a case of doing more with fewer resources. After all, isn’t that what better technology is supposed to permit you to do?

If you’re a gambler, you could simply hope for the best and pray that the equipment in the plant doesn’t crash and burn during your watch. That approach seems a bit risky considering the fact that operating equipment undergoes an inexorable amount of wear and tear.

Of course, you could post help wanted items on the many online job boards or find a recruiter who specializes in finding candidates for the maintenance arena. This might yield quite a few resumes from which you could try to cherry-pick the cream of the crop. Then the question is how well the baggage the new hire totes around meshes with the corporate culture you know and love.

Still, another idea would be to snag a brand-new graduate coming out of a trade school, if they still exist. The advantage with this approach is that you get to break in the new guy who comes with fewer preconceived notions and a lot of gratitude for the opportunity to apply all that new learning.

If you go this last route, you might want to give some thought how you integrate the newbie into the system. Adler Engineering LLC has some advice on the topic in a document titled “The Consummate Maintenance Engineer

While you’re checking out the integration process, you might consider looking at some of the case studies Adler has available (they’re shown under the grey horizontal bar on the right side).

These studies in effective troubleshooting and root cause analysis are rather thorough. Perhaps the Adler approach could serve as a best practice. You be the judge.

Sponsored Recommendations

Enclosure Climate Control: Achieving the Ideal Temperature

March 28, 2024
There are several factors to consider when optimizing the climate inside your electrical enclosure. Download this white paper to learn more.

Find the ideal enclosure cooling solution for your application

March 28, 2024
Use the Climate Control Quickfinder tool to find the ideal climate control solution for your application in just three easy steps.

Smart Cooling Solutions: Reduce Your Energy Consumption with Advanced Technology from Rittal

March 28, 2024
Wall extension cooling units for external or internal mounting in doors and walls using standardized mounting cut-outs. Cooling output 0.3 – 5.8 kW. Also available in energy-efficient...

Arc Flash Prevention: What You Need to Know

March 28, 2024
Download to learn: how an arc flash forms and common causes, safety recommendations to help prevent arc flash exposure (including the use of lockout tagout and energy isolating...