At some point in time every industrial plant must bring in an outside contractor to do specialized work such as boiler blasting, concrete waterproofing and ceiling painting that in-house manpower can’t perform on a cost-effective basis. Such an option makes sense, in that many industrial operations don’t enjoy the luxury of reassigning staff to do labor-intensive work that requires additional training. Nor does facility management have at their ready disposal the unique equipment required to perform major maintenance or upgrade projects.
However, the greater challenge lies not in deciding whether to call in outside help, but, rather, determining which contractor is best able to perform the job on time, within budget, with the best outcome and the least lapses in safety. With the right selection, an outside contractor can act as an ongoing partner to help plant managers and facility engineers reduce costs and add value over the long run.
1. Precise planning
The need to run at 100% production levels at all times heads the list of priorities at most every processing plant. Downtime for maintenance or upgrades equates with an interruption in revenue stream. In defense, the best way to avoid having any outside work halt the process is to ensure that the contractor provides a precise, highly detailed plan of the project work in advance.
If a contractor can’t tell you how he’s going to do that job and lay it out in an organized, detailed, step-by-step fashion, then you shouldn’t hire him because he isn’t sure of what he’s doing.
Put another way, if you can’t build it on paper, you can’t build it in reality. For example, by using “critical path method scheduling,” which incorporates close to 30 items and covers the scope of work, the crew, the specifications, the safety checks, the tasks broken down by craft and a complete timeline from start to finish, a project schedule should be provided to the plant manager in advance of any work.
2. A qualified workforce
Given today’s scholastic environment in which far more students study computer science as opposed to metalworking, the pool of skilled craftsmen continues to dwindle. After soliciting RFQs, the down-selection process must include a careful evaluation of the contractor’s complement of tradesmen.
The importance of having a job go smoothly rests, in great part, on the skill of the people actually twisting the wrenches. They must possess a basic aptitude for the job, as well as a good work ethic.
Advance determination of such qualities isn’t as difficult as it seems. Recognized training programs can vouch for satisfactory performance levels from a given craftsman. Additionally, most every technical discipline has credentialing bodies which evaluate respective contractors and their employees for competency.
Judging work ethic takes more effort. Look for a contractor who features a dedicated, long-term team of workers versus hiring a local crew off the street. Ask the contractor to provide a list of the potential workers and request their job histories If not available, think twice.
3. The right equipment for the job
Often underestimated, the painful truth is that inappropriate or underperforming equipment can greatly increase the time it takes to complete a project. On the other hand, contractors can actually bring about a cost savings for plant management and return the plant to full operation more quickly if they possess equipment selected with forethought and applicability to the specific project.
When tackling a critical project such as applying a coating of epoxy novolac to the inside of a 300-ft diameter storage tank, contractors should be willing to go through the trouble of bringing in portable air conditioners or heaters, depending on the time of year, to manage the environment within the tank. This controls the humidity and prevents premature rusting of the exposed metal before the coating goes on. Unanticipated coating failure could develop without such precaution. At the same time, the controlled environment allows workers to continue spraying 24 hours a day instead of only eight. The job gets finished in one-third the time, so the tank can be back in service that much sooner.
Even something as simple as ready access to the equipment and tools can make a difference in the timeline. For example, one informal time/motion study revealed the average mechanic spends an hour and five minutes each day looking for tools. Ask to see photographs of the contractor’s equipment and tool trucks. If, for example, you see a gang box filled with a bunch of tools that guys have to dig through to find what they need, then that disorganization can lead to cost overruns.
4. Safe work practices
Safety can never be compromised for the sake of speed. If anything, a serious accident can stop a project in its tracks and immediately place a project budget in peril. Checking a contractor’s commitment to safety begins at the top.
The mechanics will do whatever a supervisor lets them do. If the foreman allows the workers to stand on a ladder without a safety belt, they’ll do it. So supervisors should attend process safety management training classes so they will set the right tone. Once a project begins, the operations manager should monitor conditions constantly and conduct weekly safety inspections.
A contractor’s membership in the American Society of Safety Engineers also indicates a commitment to reducing injuries. Additionally, the prospective contractor should be able to demonstrate site-specific training of its employees. Examples include training in fall protection, respiratory protection, hazardous waste handling, mine safety and health administration procedures, and a confined-space program.
5. Access to spare parts and equipment for unforeseen circumstances
Every product manufacturer understands the need for a second-source supplier. It should be no different for contractors who show up to do critical work at a plant. The contractor must outline a systematic process to acquire spare parts on an urgent basis when the inevitable emergency occurs.
You need a Plan B, as well as a Plan C. To be on the safe side, the contractor should have duplicate pieces of machinery at the ready, so if a part breaks, it won’t halt the work. For example, when working on a tight timeline for a project, it’s a good idea to ship backup equipment to the site. It might just sit there as a backup and never be used it, but the expense is well worth the peace of mind.
6. Constant communication with plant management
Upon completion of a project, few plant managers like surprises such as unexpected, expensive change orders or upscoping. A conscientious contractor must be willing to provide project reports up-front, on a daily basis.
Clarity with the customer is crucial. At the end of each day the customer should receive three reports covering construction overview, safety and quality.
7. A willingness to partner for the long run
An index of suspicion should rise when a contractor appears anxious to take the money and run. Some eventually declare bankruptcy, leaving plant management with no recourse if anything goes wrong.
Look for a contractor who is willing to maintain an on-site presence well after completion of the scheduled work. Even beyond that, added value stems from a contractor who is willing to act as a resource for long-term maintenance planning. Such partnerships actually free up the plant’s workforce to concentrate on more immediate needs.
Plant foremen can benefit from permanently delegating some of their technical services to a contractor with expertise in their respective fields. A supplemental part of some contractors businesses is to develop specifications and procedures to reduce rework and extend service life. Many foremen stay on at a given site to provide such services as corrosion surveys, failure analyses, computerized maintenance painting programs, industrial cleaning, fireproofing and OSHA pipe labeling and safety-sign surveys which can prove to be valuable services for most plants.
Ultimately, enlisting the help of a proven contractor on a year-round basis allows processors and manufacturers to keep their own staff focused on the core competency of the organization.
Michael McMahon is president of Coating Systems (www.coatingsystems.net). Contact him at (912) 964-7884 or (888) 422-8129.