Understanding the 2 infrastructures that influence plant performance

Sept. 25, 2013
Why continuous improvement programs ignore the impact of the plant's infrastructure on productivity.

One thing that has always bothered me about most continuous improvement programs is that they ignore the impact of the plant’s infrastructure on productivity. If you stop to think about real factors that limit performance, infrastructure must be a primary consideration. Perhaps one reason that most continuous improvement programs ignore or covertly address infrastructure is that few of us like to be told that we are the reason our plants are ineffective. Think about it—if you were the CEO of your company, would you hire a consultant or adopt a continuous improvement program that pointed the finger of blame directly at corporate management?  

To me there are two distinctly different infrastructures that influence, if not control, plant performance. The first is the way that you do business and run your plant. The second is the methods and tools that are used to manage the entire operation.

Read the whole story

Sponsored Recommendations

Effective Enclosure Heating

Aug. 22, 2024
Effective enclosure heating is essential for peak operational efficiency in outdoor and indoor contexts.

Busbar: The Next Evolutionary Step in Control Panel Design

Aug. 22, 2024
Learn how busbar power distribution can help control panel manufacturers unlock enhanced safety, lower costs, and a reduced automation footprint.

Reduce Contamination with the Right Enclosure for Your Food and Beverage Application

Aug. 22, 2024
Protecting electrical controls and equipment within food and beverage plants presents unique challenges due to the sanitation requirements of the hygienic environment.

Enclosure Climate Control: Achieving the Ideal Temperature

March 28, 2024
There are several factors to consider when optimizing the climate inside your electrical enclosure. Download this white paper to learn more.