You vs. your machines: Who's in charge?

Oct. 6, 2015
Do you control your assets or do your assets control you? Tom Moriarty says that if PM and CM tasks aren't getting done, it might be time for a maintenance strategy reboot.

Does the following Socratic-like conversation sound familiar?

Reliability manager: The last reliability manager championed a big project a year ago, a failure modes and effects analysis (FMEA) project that took a lot of effort. The consultant he hired did a really good job of educating the team and facilitating the analysis. We identified all the right tasks that we need to be doing.

[sidebar id="2"]

Interviewer: So you must have a great maintenance program and everything must be going great, right?

Reliability manager: Well, not exactly. The last guy got the FMEA project done and kicked off the new maintenance program. He moved on before the new program was fully implemented. But I’m not sure that the new maintenance program would be successful even if he were still here.

Interviewer: Why is that?

Reliability manager: When I looked at the new PM and condition monitoring tasks six months after they had been put in place, the completion rates were really low—less than 70%. I went down to the maintenance manager’s office and asked him why he was having trouble getting PM and condition monitoring tasks completed. He said there just weren’t enough hours in the day.

Interviewer: Was the plant in a reactive maintenance mode before the FMEAs were done?

Reliability manager: Yes, we’ve always been reactive.

Interviewer: So maybe your plant doesn’t have a decent maintenance management software system?

Reliability manager: No, we have one of the best, most widely used and expensive software systems.

Interviewer: Let me get this straight: You spent big bucks on FMEA training and facilitation; you have an expensive and highly capable software system; and you can’t get the maintenance strategy fully implemented. Is that right?

Reliability manager: That’s right.

Interviewer: Why do you think that is?

Reliability manager: We aren’t in control. The assets are in control because they force us to respond when production is disrupted. We never know what’s coming.

Been part of conversations along those lines? I find the scenario is an all-too-common one that reminds me of some of the search-and-rescue missions I participated in "when I wore a younger man’s clothes," as singer-songwriter Billy Joel would say. I was in the Coast Guard, and we assisted people in distress, including some who had more money than sense. They bought expensive boats but had little knowledge of how to prepare, operate, and complete voyages in the open sea. They took a few classes on navigation rules and had all the best equipment: radar, satellite navigation, autopilot, depth finders, etc. Yet they still ended up running aground, wrapping lobster-trap ropes in their propellers, or getting caught by severe weather. The problem was not insufficient resources or equipment, and they were usually pretty smart people. The problem was awareness of how to maintain control and execute.

Are you doing the right work at the right time on the right asset?

This white paper explains how to implement reliability improvement strategies for APM that take advantage of new technologies to optimize asset performance and reliability by collecting, consolidating, and acting on all asset condition data.

Download the white paper

Organizations buy highly capable software and develop great maintenance strategies.  But what good are they if you can’t stay prepared and execute the strategy? When assets are in control, it is extremely difficult if not impossible to have a maintenance organization that can provide high levels of availability at lowest total cost. 

So how do you transition from the assets being in control to you being in control? First, be absolutely clear in your mind why it is important to be in control, and communicate that message throughout the organization. It’s especially important for line supervisors and the workforce to understand why and how controlling the assets will benefit them and the organization. 

Second, have a good maintenance management process and software tools that support the process. Hallmarks of good processes include well-defined procedural steps, assigned accountabilities for each step, and measures that tell you whether the process steps are being carried out properly. Software must have well-defined data structures, asset hierarchy, master data, and criticality. It must also support the process workflow, generate performance reports, and provide for data analysis. 

Third—and most often lacking—is consistent, assertive leadership at the supervisor and manager levels. This means coaching and encouragement to reinforce proper behaviors, and it means direct and timely corrections of noncompliant behaviors. For supervisors to be consistent and assertive, senior leaders need to support them. This third element is where execution lives.

If an organization’s senior leadership is unwilling to invest the time and energy in establishing consistent and assertive leadership, the organization should not expect big wins from strategies or software.

About the Author

Tom Moriarty | P.E., CMRP, President of Alidade MER, Inc.

Tom Moriarty, P.E., CMRP is president of Alidade MER, Inc., a consulting firm specializing in asset management, reliability engineering, and leadership improvement. He is a member of SMRP (Florida Chapter Board Member and CED Director), a past Chair of ASME’s Canaveral Florida Section, and author of the book “The Productive Leadership System; Maximizing Organizational Reliability”. He has a BSME, an MBA (organizational development), is a licensed professional engineer (PE) in Florida, and a Certified Maintenance and Reliability Professional (CMRP). Contact him at [email protected], (321) 773-3356, or via LinkedIn at www.linkedin.com/in/alidade-mer.

Sponsored Recommendations

Enclosure Climate Control: Achieving the Ideal Temperature

March 28, 2024
There are several factors to consider when optimizing the climate inside your electrical enclosure. Download this white paper to learn more.

Find the ideal enclosure cooling solution for your application

March 28, 2024
Use the Climate Control Quickfinder tool to find the ideal climate control solution for your application in just three easy steps.

Smart Cooling Solutions: Reduce Your Energy Consumption with Advanced Technology from Rittal

March 28, 2024
Wall extension cooling units for external or internal mounting in doors and walls using standardized mounting cut-outs. Cooling output 0.3 – 5.8 kW. Also available in energy-efficient...

Arc Flash Prevention: What You Need to Know

March 28, 2024
Download to learn: how an arc flash forms and common causes, safety recommendations to help prevent arc flash exposure (including the use of lockout tagout and energy isolating...