Home » Products » Electrical systems » Cooper Power Systems' Peak transformers manage increased loads and temporary overload capacity

Cooper Power Systems' Peak transformers manage increased loads and temporary overload capacity

Print page

Cooper Power Systems' Peak transformers are designed to manage increased loads and temporary overload capacity with a four-time greater life expectancy when compared to mineral oil-filled transformer alternatives.

Using a high-temperature insulation system — comprised of thermally upgraded kraft paper, an optimized core and coil design, and Envirotemp FR3 dielectric fluid — a 75-degree Average Winding Rise (AWR) PEAK transformer is built to be a lighter unit capable of the same ratings as a physically larger 65 AWR rated unit. PEAK transformers are filled with the biodegradable alternative to transformer oil, Envirotemp FR3 dielectric fluid. In addition, this soybean oil-based fluid creates a barrier against water at the surface of the insulation.

Peak transformers are available in 75 AWR (Average Winding Rise), 55/75 AWR, and 65/75 AWR in both 5-167 kVA single phase pole-mount transformers and 5-167 kVA single phase pad-mount transformers in either ANSI 1 or ANSI 2 configurations.

Company Information

Cooper Power Systems

Website: www.cooperpower.com