Home » Products » CECO downloadable presenetation details cost impact of wasted energy in industrial buildings and processes

CECO downloadable presenetation details cost impact of wasted energy in industrial buildings and processes

Print page

Category: Services

Product Type: Other

Manufacturer: CECO

A new downloadable presentation from the CECO Energy Management Team details the cost impact of wasted energy in industrial buildings and processes, and explains the solution steps to reduce the energy component of manufacturing costs.  Posted on the homepage CECOENVIRO.COM, the presentation explains how seven-figure savings are easily attainable and justified, with payback periods of a year or two in many cases.

The presentation shows how when energy costs are treated as a component of cost-of-goods-sold, it becomes easier to understand the importance of managing the cost, much like labor or raw materials. 

The presentation states that 60-80% of a plant's energy costs typically go into the manufacturing process, representing massive opportunities for savings that go directly to the bottom line.  According to the Department of Energy, the manufacturing-cost component for energy will increase 50% in the next three years.  The steps for managing process energy – assessment, analysis and reporting – are explained and supported with case histories.

The presentation is available for download at CECOENVIRO.COM.

CECO Environmental is North America's largest single-source provider of turnkey solutions for air pollution control and industrial ventilation.  Services include energy and emissions audits, compliance testing, custom system design, sheet-metal fabrication and system installation.

For more information on the CECO Energy Management Team, call 513.458.2677 or email cemt@cecoenviro.com.

Company Information

CECO

3120 Forrer St.
Cincinnati, Ohio 45209 (see map)
Phone: 513.458.267
Fax: www.cecoenviro.com
email: cemt@cecoenviro.com