Warning: Unknown: Unable to allocate memory for pool. in Unknown on line 0

Warning: include_once() [function.include-once]: Unable to allocate memory for pool. in /www/pro/htdocs/www.plantservices.com/industrynews/2011/107.html on line 18

Warning: require() [function.require]: Unable to allocate memory for pool. in /www/pro/htdocs/scripts_PS/include.php on line 267

Warning: session_start() [function.session-start]: Cannot send session cookie - headers already sent in /www/pro/htdocs/community/includes/bootstrap.inc on line 899

Warning: session_start() [function.session-start]: Cannot send session cache limiter - headers already sent in /www/pro/htdocs/community/includes/bootstrap.inc on line 899

Warning: Cannot modify header information - headers already sent in /www/pro/htdocs/community/includes/bootstrap.inc on line 531

Warning: Cannot modify header information - headers already sent in /www/pro/htdocs/community/includes/bootstrap.inc on line 532

Warning: Cannot modify header information - headers already sent in /www/pro/htdocs/community/includes/bootstrap.inc on line 533

Warning: Cannot modify header information - headers already sent in /www/pro/htdocs/community/includes/bootstrap.inc on line 534

Warning: include_once() [function.include-once]: Unable to allocate memory for pool. in /www/pro/htdocs/community/sites/all/themes/zen/template.php on line 33

Warning: include_once() [function.include-once]: Unable to allocate memory for pool. in /www/pro/htdocs/community/sites/all/themes/zen/template-subtheme.php on line 10

Warning: include_once() [function.include-once]: Unable to allocate memory for pool. in /www/pro/htdocs/community/sites/all/themes/zen/plantservices/template.php on line 56

Warning: array_key_exists() [function.array-key-exists]: The second argument should be either an array or an object in /www/pro/htdocs/community/includes/module.inc on line 217

Warning: array_key_exists() [function.array-key-exists]: The second argument should be either an array or an object in /www/pro/htdocs/community/includes/module.inc on line 217

Warning: include_once() [function.include-once]: Unable to allocate memory for pool. in /www/pro/htdocs/community/sites/all/themes/zen/plantservices/template.php on line 86

Warning: include_once() [function.include-once]: Unable to allocate memory for pool. in /www/pro/htdocs/community/sites/all/themes/zen/template.php on line 36

Warning: include_once() [function.include-once]: Unable to allocate memory for pool. in /www/pro/htdocs/community/sites/all/themes/zen/template.php on line 39
Plant Maintenance News | ASHRAE funds research to improve building maintenance and operation through performance data | Plant Services

Home » Industry News » ASHRAE funds research to improve building maintenance and operation through performance data

News

Print page

Posted On: 03/21/2011

ASHRAE funds research to improve building maintenance and operation through performance data

ASHRAE

Guidance to specifying engineers and designers on how they can use building data to improve building operations, energy efficiency, comfort and sustainability will be developed through newly funded research from ASHRAE.

Research Project 1633, “Data and Interfaces for Advanced Building Maintenance and Operation,” will result in development of a set of standard data-driven metrics, interfaces and dashboards for advanced building operation and management.

It was one of three projects totaling $430,000 approved by ASHRAE at its 2011 Winter Conference.  The 1633 project is sponsored by Technical Committee 1.4, Control Theory and Application, and co-sponsored by 7.6, Building Energy Performance, and TC 7.9, Building Commissioning, and was awarded to KGS Buildings, Cambridge, Mass.

“Analyzing and interpreting building performance data is critical to the success of high performance buildings,” Stephen Samouhos, Ph.D., principal investigator, said. “This research will help fill a void in standards literature by establishing data-driven metrics, interfaces and dashboards, organized by building type, that clearly quantify and communicate building performance to a diverse set of building stakeholders.”

The other two projects approved at the Winter Conference are:

  • 1580-RP, “Study of Input Parameters for Risk Assessment of 2L Flammable Refrigerants in Residential Air Conditioning and Small Commercial Refrigeration Applications,” sponsored by TC 3.1, Refrigerants and Secondary Coolants; awarded to Navigant Consulting Inc.
  • 1613-RP, “Update Climatic Design Data in Chapter 14 of the 2013 Handbook, Fundaments,” sponsored by TC 4.2, Climatic Information, awarded to Numerical Logistics Inc.

More News:
Free Subscriptions

Plant Services Digital Edition

Access the entire print issue on-line and be notified each month via e-mail when your new issue is ready for you. Subscribe today.