How changes to the National Electrical Code will affect your plant

June 18, 2013
NFPA members vote on final amendments to 2014 NEC.

Whether moving a production line or replacing a broken 120-V receptacle, the National Electrical Code applies. Compliance with building codes, such as the NEC, is not an option. Plant managers, engineers, and maintenance staff must be aware that, for 2014, the electrical code will change. During the week of June 10, 2013, NFPA committee members met in Chicago to vote on the final amendments to the 2014 NEC. It will be published in October of this year and become effective January 1, 2014.

There will be many changes in the new code and a good percentage will affect how electrical work is performed in manufacturing plants. These include the addition of new topics to the code, enhancement of personnel safety, and the revision, deletion, and addition of various general requirements.

Four new articles have been incorporated for 2014 to address the needs of industry:

  • Article 750 will address energy management systems. As saving energy dollars becomes more important in plants, the electrical code will now give guidance on the installation of smart grid management systems. Requirements will go right down to the marking symbol on controlled receptacles.
  • Article 393 will cover low-voltage suspended-ceiling power-distribution systems. These are 30-V lighting systems attached to the suspended-ceiling grid. Such systems will be found in office and other administrative areas where suspended ceilings are common.
  • Article 646 on modular data centers will be incorporated into the code to keep up with modern technology. Though available in many sizes and configurations, the individual “building block” units typically consist of data servers, associated power supplies, and cooling units that can be easily expanded in capacity over time by adding more prefabricated modules.
  • Article 728 will address fire-resistant cable systems. Should a plant fire occur it is vital that certain cables continue to function. Such cables will be required to meet specific criteria and installation requirements.

The newly revised NEC will enhance personnel safety through centralizing and clarifying requirements for the use of lockable disconnects. Locking out and properly verifying a circuit de-energized is vital for plant personnel safety. Arc-flash warning label requirements will undergo some changes. Also, methods used to mitigate the arc-flash hazard in distribution systems will be revised. Interestingly enough, one particular proposal that would have increased the requirements for equipment grounding conductors to reduce the chance of shock or electrocution to persons working on rooftop HVAC units will probably not be approved for final inclusion into the code. Though based on a recent tragic accident that was the result of a faulty conduit system, the committee members note that, had the conduit system been properly maintained after initial installation, the accident would not have occurred. The NEC does point out in one of its very first sections that electrical systems and equipment must be maintained to remain safe after installation.

Other topics that will change and affect plants in various ways include:

  • personnel door requirements for electrical rooms
  • new identification methods for DC positive and negative conductors
  • GFCI requirements in non-dwelling unit garages
  • grounding and bonding requirements including a new table in Article 250
  • marking requirements on cable trays
  • receptacles supplying vending machines
  • labeling on generators and new generator receptacle requirements
  • expansion of requirements for office furnishings, especially pre-wired workstations.
Randy Barnett is director of electrical programs for NTT Training. Contact him at [email protected].

Plant maintenance and engineering departments should determine when the 2014 NEC becomes effective at the facility as jurisdictional requirements vary. Once published, affected personnel should update themselves on these recent changes and verify all maintenance and plant retrofit work conforms to the 2014 National Electrical Code.

Sponsored Recommendations

Limitations of MERV Ratings for Dust Collector Filters

Feb. 23, 2024
It can be complicated and confusing to select the safest and most efficient dust collector filters for your facility. For the HVAC industry, MERV ratings are king. But MERV ratings...

The Importance of Air-To-Cloth Ratio when Selecting Dust Collector Filters

Feb. 23, 2024
Selecting the right filter cartridges for your application can be complicated. There are a lot of things to evaluate and consider...like air-to-cloth ratio. When your filters ...

ASHRAE Standard 199 for Evaluating Dust Collection Systems

Feb. 23, 2024
This standard ensures dust collection systems are tested under real-world conditions, measuring a dust collector's emissions, pressure drop, and compressed air usage. Learn why...

Dust Collector Explosion Protection

Feb. 23, 2024
Combustible dust explosions are a serious risk, and an unprotected dust collection system can be a main cause. Learn what NFPA-compliant explosion protection you need to keep ...