Interested in linking to "CMMS Review Sections"?
You may use the Headline, Deck, Byline and URL of this article on your Web site. To link to this article, select and copy the HTML code below and paste it on your own Web site.
|
Jump to Questions and link for: | |
| #1 | Open Questions 1 - 11: Company - Package - Price |
| #2 | Open Questions 12 - 20: Integration |
| 11 | Language: In what language is the program written? |
| 12a | Cost % hardware: What percent of the total invoice to a new customer is for hardware? |
| 12b | Cost % software: What percent of the total invoice to a new customer is for software licenses? |
| 12c | Cost % customization: What percent of the total invoice to a new customer is for customization? |
| 12d | Cost % business redesign: What percent of the total invoice to a new customer is for business process redesign? |
| 12e | Cost % implementation: What percent of the total invoice to a new customer is for implementation? |
| 13a | Implementations targeting KPIs: Prior to implementation, in what percent of installations are targets set for improvement of key performance measures? |
| 13b | 1-5 KPIs: The top five key measures. |
| 14a | % cost savings: The average cost savings achieved per site after implementing the CMMS. |
| 14b | % revenue increase: The average revenue enhancement achieved per site after implementing the CMMS |
| 15a | % Shared fee: The percentage of customers where normal fee is conditional on meeting performance targets for the customers' operations, e.g., a penalty if a percent reduction in downtime is not achieved) |
| 15b | % Shared rewards: The percentage of customers where a bonus is available upon achieving performance hurdles |
|
ADVERTISEMENT 15c |
% No incentive: The percentage of customers where there is no formal linkage between cost and results |
| 16 | Tracking: Is each user company's customer satisfaction/loyalty tracked with a survey that is comprehensive (i.e., high percent of customer base, across multiple users per company, for many measures, more than once per company)? |
| 17a | Third-party ERP: Does the vendor have specialized software for integrating third-party ERP software? |
| 17b | Third-party CAD: Does the vendor have specialized software for integrating third-party CAD software? |
| 17c | Third-party PdM: Does the vendor have specialized software for integrating third-party PdM software (e.g. vibration, lubrication, thermography)? |
| 17d | Third-party data: Does the vendor have specialized software for integrating third-party shop-floor data collection systems (e.g. HMI, PLC, SCADA)? |
| 17e | Third-party handheld? Does the vendor have specialized software for integrating third-party wireless handhelds (e.g. PDAs, barcode readers)? |
| 17f | Other integration: Other third-party software integration capabilities? |
| 18 | Phase-in: Can clients use a phased approach to implement the CMMS, buying greater functionality over time? |
| 19 | Remote database synch: Does the CMMS have built-in utilities to allow remote user sites to synchronize databases? |
|
20 |
Browser/look & feel: Does the browser version have the same functionality and a similar look and feel to the client/server CMMS package?
|
| #3 | Open Questions 21 - 35: Basic Capabilities |
| 21 | Voice: Can information be received and transmitted remotely via an interactive voice response (IVR) system? |
| 22a | Format error-check: Is there error-checking capability for format (e.g., part number must be five numeric digits starting with an alpha character)? |
| 22b | Range error-check: Is there error-checking capability for range (e.g., equipment code ranges from 1500 to 3000)? |
| 22c | Logic error-check: Is there error-checking capability for logic (e.g., wrong engine on vehicle, too many or not enough pumps in a given piece of equipment)? |
| 23 | Error message quality: Are error or other messages comprehensive, easy to understand and suggest solutions? |
| 24 | Custom error messages: Are error, warning and other messages customizable by the user? |
|
25 |
User-defined defaults: Can the user define all default values to ease data entry? |
| 26a | Multi-language log-on: Does the package support multiple languages in one implementation such that you can tailor each user screen to a given language based on logon? |
| 26b | Multi-language toggle: Can each user toggle between two or more languages at a given terminal? |
| 27 | Quick data entry: Is there a quick data-entry screen for high-volume entries, such as system startup or a dispatch desk? |
| 28 | Online help: Is there online help specific to procedures (i.e., "how-to" help)? |
| 29 | Help examples: Are examples given throughout help screens? |
| 30 | Help tailoring: Is online help tailored to the knowledge and experience of the user? |
| 31a | Training days, supervisor: How many days of classroom/CBT training would you recommend for the average novice maintenance supervisor to take for your CMMS? |
| 31b | Training days, planner: How much classroom/CBT training would you recommend for the average novice maintenance planner to take for your CMMS? |
| 31c | Training days, tradesperson: How much classroom/CBT training would you recommend for the average novice maintenance tradesperson to take for your CMMS? |
| 31d | Training days, buyer: How much classroom/CBT training would you recommend for the average novice buyer to take for your CMMS? |
| 32 | Custom business rules: Are embedded business rules easily customizable by the user (e.g., approval limits and routing)? |
| 33 | Workflow integration: Is workflow software fully integrated into the CMMS? |
| 34 | Drill-down: Is there drill-down capability for summary reports and listings? |
|
35 |
Editing: Can you edit data while viewing in spreadsheet or list mode (e.g., outstanding work orders)?
|
| #4 | Open Questions 36 - 43: Work Order Scheduling |
| 36 | Work order hierarchy: Is there a hierarchy of work orders where each level can be scheduled separately? |
|
37 |
Blanket work orders: Can you create blanket work orders for planning/recording work, including recording blanket WO #, as well as equipment number and/or cost center (e.g., to avoid issuing a work order for jobs under 30 minutes)? |
| 38a | Time-based priorities: The number of time-based priority fields |
| 38b | Criticality priorities: The number of equipment criticality-based priority fields |
| 38c | Health & safety priorities: The number of health and safety-based priority fields |
| 38d | Other priorities/levels: Other priority fields/number of levels |
| 38e | User-defined priorities: The number of user-defined priority fields |
| 39 | Multiple priorities: Are priorities combined and used to determine or suggest a schedule (e.g., multiply priorities together)? |
| 40 | Schedule display: Can the schedule display in-process work orders, including revised hours by craft to completion or percent completion? |
| 41 | Graphical scheduling: Can you drag and drop work orders and/or available resources on a graphical schedule, and see the effects on planned workload vs. capacity as well as resultant availability? |
| 42 | Schedule drill-down: Can you drill down to access work order information from within the schedule chart/graph? |
| 43a | What-if scheduling, priority-based: Can you perform "what-if" analysis on the schedule (i.e., go into simulation mode with an opportunity to accept or reject results of the simulation) using changes to work order priority? |
| 43b | What-if scheduling, duration-based: Can you perform "what-if" analysis on the schedule using changes to estimated duration? |
|
43c |
What-if scheduling, labor-based: Can you perform "what-if" analysis on the schedule using changes to labor availability?
|
| #5 | Open Questions 44 - 51: Work Order Control |
| 44a | Resource scheduling: Can resources such as tools, cranes, or special equipment be scheduled separately (e.g., to avoid double booking)? |
| 44b | Resource analysis: Can resources such as tools, cranes, or special equipment be analyzed separately (e.g., utilization)? |
| 44c | Resource costing: Can resources such as tools, cranes, or special equipment be costed separately (e.g., using allocation by resource type)? |
|
45 |
Part source identification: On a work order, can users easily select new, reconditioned or used parts? |
| 46 | Approval change on overrun: Does approval level change when a work order is overrun for total labor and material dollars booked? |
| 47 | Approval status change definition: Can you define approvals for status changes for work orders, purchase orders, etc.? |
| 48 | Cost center security: Can you prohibit a user charging dollars to someone else's cost center? |
| 49 | Contract tracking: Can you track contract maintenance? |
| 50a | Third-party billing, invoice: Can the system handle third-party billing (i.e., chargebacks), including creation of a third-party invoice for labor/materials? |
| 50b | Third-party billing, mark up L&M: Can the system handle third-party billing (i.e., chargebacks), including mark up of labor and material costs? |
| 50c | Third-party billing, mark up other: Can the system handle third-party billing (i.e., chargebacks), including mark up of costs other than labor/materials? |
| 50d | Third-party billing, rounding: Can the system handle third-party billing (i.e., chargebacks), including rounding of time and costs? |
| 50e | Third-party billing, minimum time: Can the system handle third-party billing (i.e., chargebacks), including establishing a minimum labor time? |
| 50f | Third-party billing, minimum charge: Can the system handle third-party billing (i.e., chargebacks), including establishing a minimum dollar charge? |
| 50g | Third-party billing security: Can the system handle third-party billing (i.e., chargebacks), including allowing customer to access only its own information? |
| 51a | Warranty work orders: Can the system perform summary reporting of all work orders on warranty? |
| 51b | Warranty claims: Can the system prepare warranty claims? |
| 51c | Multiple warranties: Can the system record and track multiple warranties per asset? |
| 51d | Warranty types: Can the system record warranty types (e.g., manufacturer, vendor, extended)? |
| 51e | Calendar warranties: Can the system track calendar-based warranties? |
| 51f | Meter warranties: Can the system track meter-based warranties, including start/expiration/threshold readings? |
| 51g | Warranty renewals: Can the system handle warranty renewals? |
| 51h | Serial-based warranty expiration: Can the system favor serialized parts closer to warranty expiration? |
|
51i |
Non-serial-based warranty expiration: Can the system favor non-serialized parts closer to expiration?
|
| #6 | Open Questions 52 - 67: Inventory Control & Purchasing |
| 52a | LIFO inventory: Is LIFO available for the inventory module? |
| 52b | FIFO inventory: Is FIFO available for the inventory module? |
| 52c | Average costing: Is average costing available for the inventory module? |
| 52d | Standard costing: Is standard costing available for the inventory module? |
| 53 | Activity-based costing: Is activity-based-costing (ABC) fully integrated into the CMMS? |
| 54 | EOQ: Is economic order quantity (EOQ) calculated? |
| 55a | ABC analysis: Is ABC analysis done (i.e., categories for parts usage)? |
| 55b | XYZ analysis: Is XYZ analysis done (i.e., categories for parts value)? |
| 56 | Reorder smoothing: Does the reorder point have smoothing capability? |
| 57a | Service levels by part: Are service levels analyzed by part? |
| 57b | Service levels by category: Are service levels analyzed by part category? |
| 58 | What-if on service levels: Can you do "what-if" analysis on service levels to determine resultant inventory values? |
| 59 | Cycle counts: Will the CMMS program assist in determining cycle counts? |
| 60 | Supplier history: Can you track supplier history? |
| 61 | Supplier rating: Can you rate suppliers? |
| 62 | E-procurement: Can the system handle e-procurement (e.g., catalog, purchase orders, quotations, and vendor invoices)? |
| 63a | History-based reorder: Is usage history automatically checked to suggest corrections to reorder points? |
| 63b | History-based reorder: Is usage history automatically checked to suggest corrections to reorder points? |
| 63c | Max level-based reorder: Is maximum level history automatically checked to suggest corrections to reorder points? |
| 64 | Component tracking: Can components be serialized and repair history/costs tracked (i.e. from receipt to installation, to vendor repair, to receipt upon return, to costing at repaired, depreciated or appreciated value, to new parent equipment)? |
|
65 |
New/used parts: When booking parts required for a work order, will the parts on-hand listing within the work order screen show repaired or used parts/components available separately from new ones? |
| 66a | Expected delivery: Will the purchase order accommodate expected delivery date for each line item? |
| 66b | Multiple account codes: Will the purchase order accommodate multiple account codes for each line item? |
| 66c | Status code: Will the purchase order accommodate a status code for each line item? |
| 66d | Multiple ship-to: Will the purchase order accommodate multiple ship-to locations for each line item? |
| 66e | Tax codes: Will the purchase order accommodate tax codes for each line item? |
| 66f | Receipt acknowledgement: Will the purchase order accommodate receiving acknowledgement for each line item? |
|
67 |
Consignments: Does the system handle consignments?
|
| #7 | Open Questions 68 - 73: Preventive and Condition-Based Maintenance I |
| 68a | Standard PM tasks: Is standard data available for PM task definitions? |
| 68b | Standard PM task times: Is standard data available for PM task times? |
| 68c | Standard corrective tasks: Is standard data available for corrective tasks? |
| 68d | Standard RCM conditions: Is standard data available for RCM conditions linked to tasks? |
| 68e | Standard safety: Is standard data available for safety checklists and tasks? |
| 69 | PM triggers: Can you trigger PM by time, usage and event? |
| 70a | Multiple condition triggers: Can you trigger preventive maintenance by multiple condition indicators per asset? |
| 70b | Automatic trigger reset: Does a trigger from one condition-based indicator reset all other triggers for a given asset? |
| 70c | Nested triggers: Can you nest triggers with different cycles? |
| 70d | Combined indicators: Can you combine indicators using Boolean logic to create consolidated or alternate triggers? |
| 70e | Recommend corrective action: Can you recommend corrective action based on condition, i.e., using indicators, Boolean logic, and/or setpoints (e.g., oil analysis reveals gas, particulate or temperature trends that necessitate a given PM work request)? |
| 70f | Preferred date: Can you trigger a PM routine on a preferred day or date if within tolerance? |
| 70g | Forecast rounds schedule: Can you forecast when the next meter reading should occur based on historical readings? |
| 70h | PM shadowing: Can you do PM shadowing to avoid duplicate PMs? |
|
70i |
PM override: Can PMs be overridden or credit taken for corrective work that covers PM work due, to avoid duplication? |
| 70j | Reading validation: Can PM readings be validated with a user-defined validation formula? |
| 70k | Color-coded alarms: Can indicator/alarm tables be color-coded? |
| 70l | Component/indicator hierarchy: Can you create a graphic showing component hierarchy and corresponding indicators |
| 70m | Indicator drill-down: Can you have hot spots on the graphic for drill down to detail on indicators? |
| 70n | Graphic highlights: Are conditions and alarms visibly distinguished on the graphic (e.g., blinking, color change)? |
| 70o | Alarm acknowledge: Can you acknowledging alarms or conditions easily from within the graphic screen? |
| 70p | New condition entry: Can a new condition be easily entered from within the graphic screen? |
| 71 | History-based PM: Is PM history used to correct future PM scheduling? |
| 72 | Seasonal PM: Can users adjust the PM schedule for seasonality? |
|
73 |
Shutdowns/peaks/holidays: Does the PM schedule display shutdowns, peak production periods and/or holidays?
|
| #8 | Open Questions 74 - 82: Preventive and Condition-Based Maintenance II |
| 74a | PM by the hour: Can you schedule PM by the hour? |
| 74b | PM by recurrences: Can you schedule PM by recurrences? |
| 74c | PM by calendar: Can you schedule PM by recurring month, weeks or days? |
| 74d | PM by date: Can you specify PM by specific calendar dates? |
| 74e | PM by exception: Can you specify PM with specific calendar dates as exceptions? |
| 75a | PM route by asset type: Can you set up a PM route for a single asset type across multiple locations (e.g., inspection of all fire extinguishers in multiple buildings)? |
|
75b |
PM route by location: Can you set up a PM route for multiple assets in a single location (e.g., inspection of multiple assets on one stretch of roadway)? |
| 76 | GIS location: Can you inventory assets, route PMs and report on work history referencing a GIS locator? |
| 77 | Problem/cause/action: Can problem, cause and action taken be recorded against individual assets along the route (e.g., one fire extinguisher refilled, another required repair)? |
| 78a | L&M by asset: Can labor and material be charged to an individual asset along the route? |
| 78b | L&M averaged: Can labor and materials be charged using an average cost spread over all assets on the route? |
| 79 | Critical percent: Can you identify a "critical percent" for each asset/procedure (where 0% = PM just done, 100% = PM just due, 200% = PM not done after one complete cycle, etc.)? |
| 80 | Critical route: Can you generate a route based on Boolean logic surrounding the critical percent? |
| 81 | Auto priority increase: Will the priority automatically increase if PM is not done? |
| 82a | Multiple inspections: Do you have features and functions for inspection and risk assessment including multiple inspections at multiple points on an asset/infrastructure? |
| 82b | Risk/criticality record: Does inspection and risk assessment support recording results of a risk-based assessment defining risk and criticality of failure? |
| 82c | Automatic frequency: Does inspection and risk assessment support automatically increasing the frequency of inspection if the risk increases? |
| 82d | Confidence rating: Does inspection and risk assessment support the ability to define a "confidence rating" on the risk? |
| 82e | Expected value: Does inspection and risk assessment support providing the inspector with nominal (i.e., expected) values for a given inspection? |
| 82f | Historical information: Does inspection and risk assessment support providing the inspector with historical information including last value, date and description? |
| 82g | Track inspection tools: Does inspection and risk assessment support tracking replacement frequency for inspection tools? |
| 82h | Critical value formula: Does inspection and risk assessment support defining a formula to determine the critical value for inspection readings? |
| 82i | WO/PM on critical value: Does inspection and risk assessment support automatically issuing a standard work order or PM procedure if the critical value is reached? |
| 82j | Min/max values: Does inspection and risk assessment support defining min and max threshold values for inspection readings? |
| 82k | Tolerance: Does inspection and risk assessment support defining a tolerance percent? |
| 82l | Regression analysis: Does inspection and risk assessment support using regression analysis to predict the next date for reaching the critical value? |
|
82m |
Extreme value: Does inspection and risk assessment support recording an "extreme value" (i.e., amount which cannot be exceeded)?
|
| #9 | Open Questions 83 - 91: Equipment History |
| 83 | Downtime vs. breakdown: Is production downtime distinguished from equipment breakdown, and are both tracked? |
| 84 | Actual vs. budget: Can you budget and track actual maintenance costs against budget? |
| 85 | Budget integration: Is the budgeting module directly integrated with the planned hours and planned material usage on the work orders? |
| 86 | Budget what-if: Can you perform "what-if" analysis on the budget by generating work orders or preparing a work plan in simulation mode, with an opportunity to accept or reject results of the simulation? |
| 87 | User-defined costs: Can you track equipment costs by user-defined statistics (e.g., cost per ton produced, cost per mile)? |
| 88 | Problem/cause/action: Are problem, cause and action codes grouped, nested and hierarchical? |
| 89a | Complaint analysis: Does the CMMS analyze, not just report on, relative frequencies and probabilities of complaints (i.e., using Pareto analysis, predictive trending, root cause analysis, correlation, forecasting, etc.)? |
| 89b | Root cause analysis: Does the CMMS analyze root causes? |
| 89c | Actions taken analysis: Does the CMMS analyze actions taken? |
| 89d | Idle/delay analysis: Does the CMMS analyze idle or delay time? |
| 89e | WO history analysis: Does the CMMS analyze work order status history? |
| 89f | Availability analysis: Does the CMMS analyze asset availability? |
| 89g | Utilization analysis: Does the CMMS analyze asset utilization (i.e. available and used)? |
| 89h | Performance analysis: Does the CMMS analyze asset performance (e.g. speed)? |
| 89i | Quality impact: Does the CMMS analyze product quality impact (e.g. asset causing rework, etc.)? |
| 90a | Report MTBF: Does the CMMS report on mean time between failures? |
| 90b | MTBF by root cause: Does the CMMS report on MTBF for a specific root cause? |
| 90c | Report MTTR: Does the CMMS report on mean time to repair? |
| 90d | Report MWT: Does the CMMS report on mean wait time (MWT) or response time? |
| 90e | TSLF by problem: Does the CMMS report time since last failure trend for any problem code? |
| 90f | TSLF by cause: Does the CMMS report time since last failure (TSLF) trend for any cause code? |
| 90g | TSLF by action: Does the CMMS report time since last failure (TSLF) trend for any action code? |
| 90h | TSLF by checkpoint: Does the CMMS report time since last failure trend from the last checkpoint? |
|
90i |
Life cycle costing: Does the CMMS report lifecycle cost for a given asset or group of assets? |
|
91 |
Troubleshooting database: Is there a troubleshooting database to assist in diagnosing equipment repair problems?
|
| #10 | Open Questions 92 - 94: Advanced Functions & Displays I |
| 92a | Trigger on PM: Can you trigger a user-defined activity (such as an alarm, pager, email, or work order activation) when PM inspection measures exceed control limits? |
| 92b | Trigger on limits: Can you trigger a user-defined activity when measures trend within a certain percentage of control limits? |
| 92c | Trigger on downtime: Can you trigger a user-defined activity when equipment downtime exceeds a threshold value? |
| 92d | Trigger on MTBF: Can you trigger a user-defined activity when average MTBF is outside a given range of values? |
| 92e | Trigger on warranty: Can you trigger a user-defined activity when equipment or a component is due for warranty work? |
| 92f | Trigger on parts missing: Can you trigger a user-defined activity when parts have not arrived for a work order coming due? |
| 92g | Trigger on wait time: Can you trigger a user-defined activity when wait time within a workflow exceeds a value? |
| 92h | Trigger on activity times: Can you trigger a user-defined activity when activity times within a workflow exceed standard? |
| 92i | Trigger on PM critical %: Can you trigger a user-defined activity when a PM critical percent has exceeded a user-defined threshold? |
| 92j | Trigger on expenditure: Can you trigger a user-defined activity when the rate of expenditure will cause a budget overrun? |
| 92k | Trigger on repeat failure: Can you trigger a user-defined activity when a failure has repeated within a user-defined period? |
| 93a | Lookup equipment: Is there an MS Windows Explorer-style lookup capability for the hierarchy of equipment? |
| 93b | Lookup parts: Is there an MS Windows Explorer-style lookup capability for parts? |
| 93c | Lookup suppliers: Is there an MS Windows Explorer-style lookup capability for suppliers? |
| 93d | Lookup employees: Is there an MS Windows Explorer-style lookup capability for employees? |
| 93e | Lookup work orders: Is there an MS Windows Explorer-style lookup capability for work orders? |
| 93f | Lookup online help: Is there an MS Windows Explorer-style lookup capability for online help? |
| 93g | Lookup corporate structure: Is there an MS Windows Explorer-style lookup capability for corporate structure? |
| 93h | Lookup warehouses/stores: Is there an MS Windows Explorer-style lookup capability for warehouses/stores? |
| 93i | Lookup projects: Is there an MS Windows Explorer-style lookup capability for projects? |
| 93j | Lookup KPIs: Is there an MS Windows Explorer-style lookup capability for key performance indicators (KPIs)? |
| 93k | Lookup menus/functions: Is there an MS Windows Explorer-style lookup capability for the CMMS menus/functions? |
|
93l |
Lookup G/L accounts: Is there an MS Windows Explorer-style lookup capability for general ledger accounts? |
|
94 |
Toggle: For each of the hierarchies in question 93, can you toggle between multiple windows showing additional information?
|
| #11 | Open Questions 95 - 100: Advanced Functions & Displays II |
| 95a | Business intelligence: Are business intelligence reporting formats such as dashboards, stoplights, etc., fully integrated? |
| 95b | Balanced scorecard: Are balanced scorecard reporting formats fully integrated? |
| 95c | KPI reports: Are key performance indicator and target reporting formats fully integrated? |
| 96a | PDA WO integration: Does the CMMS interface seamlessly with PDAs including ability to download work orders to the PDA? |
| 96b | PDA work: Does the CMMS interface seamlessly with PDAs including ability to upload hours worked and work done from the PDA? |
| 96c | PDA parts required: Does the CMMS interface seamlessly with PDAs including ability to download parts required to the PDA? |
| 96d | PDA inventory: Does the CMMS interface seamlessly with PDAs including ability to download other inventory information to the PDA? |
| 96e | PDA parts used: Does the CMMS interface seamlessly with PDAs including ability to upload parts used? |
| 96f | PDA tools required: Does the CMMS interface seamlessly with PDAs including ability to download tools required to the PDA? |
| 96g | PDA scanner: Does the CMMS interface seamlessly with PDAs including ability to use a built-in scanner for barcodes on assets/parts/badges? |
| 96h | PDA work requests: Does the CMMS interface seamlessly with PDAs including ability to enter and upload work requests? |
| 97a | Fleet VMRS: Do vehicle/fleet maintenance functions include built-in VMRS standard codes? |
| 97b | Fleet fuel: Do vehicle/fleet maintenance functions include consumption rate of fuel and other consumables? |
| 97c | Vehicle mileage: Do vehicle/fleet maintenance functions include vehicle mileage? |
| 97d | Vehicle utilization: Do vehicle/fleet maintenance functions include vehicle utilization? |
| 97e | Vehicle status: Do vehicle/fleet maintenance functions include real-time operational status of a given vehicle? |
| 97f | Vehicle environment: Do vehicle/fleet maintenance functions include analysis of environmental correlations such as weather? |
| 97g | Vehicle wear analysis: Do vehicle/fleet maintenance functions include wear measure history and analysis on tires, brakes, etc.? |
| 97h | Vehicle reservations: Do vehicle/fleet maintenance functions include vehicle reservations? |
| 97i | Fleet depreciation: Do vehicle/fleet maintenance functions include depreciation of fleet assets? |
| 97j | Vehicle operation: Do vehicle/fleet maintenance functions include recording operational data for a given vehicle (e.g. primary driver, key number)? |
| 98 | IT asset management: Are there features and functions specific to technology asset management? |
| 99 | Capital asset planning: Are there features and functions specific to capital asset planning? |
| 100a | Tool management: Is there is a separate, comprehensive, specialized tool management module? |
| 100b | Keys management: Is there is a separate, comprehensive, specialized keys management module? |
|
100c |
Lockout/tagout: Is there is a separate, comprehensive, specialized lockout/tagout tool management module? |
PlantServices.com is an MRO (maintain, repair, replace, retrofit, overhaul and operations) resource site that features problem-solving articles and editorials for plant maintenance professionals.